building update #4

a trench never looked so good

Construction is in full swing. The plumbers will finish in the next week. The HVAC contractor is installing ducting. Fire suppression should start next week. Moving right along!

Trenching for the future bathroom plumbing. A thing of beauty.

Trenching for the future bathroom plumbing. A thing of beauty.

From the foyer, looking at the entrance to the main gathering space.

From the foyer, looking at the entrance to the main gathering space.

From the stage, looking toward the main entrance.

From the stage, looking toward the main entrance.

A hallway in Kids' City.

A hallway in Kids' City.